hotel indigo

commercial kitchen, supply & installation

This award winning hotel is nestled in a busy part of the Paddington neighbourhood, a place defined by comings and goings—vibrant with movement, eclectic and multicultural—things that vividly inspire our décor and overall experience.

The full refurbishment of the kitchen duration was 7 days. Which included a full removal of all the kitchen equipment which was brought back to Harrison Carr. Each piece of equipment to had a full test and report which was sent to the customer with parts needed. Once approved from the customer,  a full strip down of each piece of equipment, which was cleaned and then re-built.

Each piece of equipment was then given a final test from a qualified engineer, delivered back to the site and re installed.